What Trades Do You Need to Install a DIY Fibreglass Pool? (The Complete List)

By Colm Walsh, October 9th, 2026
6m Oasis Install

To install a DIY fibreglass pool kit in Australia you typically need a certifier (or council), an excavator operator, a crane, a licensed plumber, a licensed electrician, a concreter and a pool fencer, plus a paver or landscaper to finish. You don't do the labouring. You book each trade in the right order and check their licences. You're managing, not digging.

Key takeaways

  • DIY doesn't mean digging. With a pool kit, your job is to manage the build. Licensed trades do the physical work.
  • Most builds need 7 to 9 trades or services, booked in a set order: approval, excavation, crane, plumbing and electrical, backfill and bond beam, fencing, then surrounds.
  • Book the certifier and fencer first. They are the two steps most likely to add weeks if left until the shell arrives.
  • Check owner-builder rules. In NSW you need an owner-builder permit if you coordinate two or more contractors on pool work valued at more than $10,000. QLD's threshold is $11,000 (incl. GST) and VIC's is $16,000.
  • Plumbing and electrical must be done by licensed trades in every state. Ask for their licence number before you book.

Do you have to dig the pool yourself if you buy a pool kit?

No. This is the biggest myth about DIY pools. When you buy a pool kit from Swimming Pool Kits Direct, you get the shell, the equipment package, the engineering drawings and delivery to your kerb. The "DIY" part is the project management: choosing your trades, booking them in order and keeping the job moving.

That's the role a pool builder normally charges a margin for. Customers who manage their own build typically save $10,000 to $30,000 compared with a fully installed pool of the same size. If you would rather hand it all over, read our comparison of DIY vs installed fibreglass pools first.

And the coordination itself is smaller than people expect. As we explained in The $25,000 Phone Call, it mostly comes down to a handful of calls made at the right time.

What trades do you need to install a fibreglass pool? (The complete list)

Here is every trade and service on a typical inground fibreglass pool kit build, in the order you'll need them.

# Trade or service What they do When to book What to ask for
1 Private certifier or council Assesses and approves your pool plans (using the engineering drawings in your kit) The week you order your pool Approval pathway for your site (e.g. CDC or DA in NSW)
2 Before You Dig Australia (BYDA) Free check for underground services before excavation Before the excavator is booked Service plans for your address
3 Excavator operator (plus tipper trucks) Digs the hole and plumbing trenches; removes spoil 2 to 4 weeks before delivery [CONFIRM typical lead time] Rock clause, spoil removal price, machine access width
4 Crane hire Lifts the shell from the truck into the hole Lock in once delivery date is confirmed Reach, access, power lines, operator included
5 Licensed plumber Connects skimmer, returns and filtration equipment Same day or shortly after the shell is placed Licence number; pool experience
6 Licensed electrician Powers pump, chlorinator and lights; equipotential bonding Alongside the plumber Licence number; electrical compliance certificate
7 Concreter Bond beam around the shell; can also do coping and paths After backfill Experience with fibreglass bond beams
8 Pool fencer Installs a compliant pool barrier Quote early, install before the pool is filled for use Compliance with your state's standard
9 Paver, tiler or landscaper Coping, surrounds, decking and planting Last, once fencing lines are set Non-slip finishes; drainage away from the pool

 

What order should you book the trades in?

Getting the order right is where most of the time is saved. Our pool installation guide breaks the build into eight stages: site preparation, excavation, base material, shell delivery, plumbing and electrical, backfilling, bond beam and coping, and pool set-up. Here's how the trades line up against those stages.

  1. Approval first. Send your engineering drawings to a certifier or council as soon as you order. Nothing can start until this is sorted.
  2. Fencing quote in the same week. Get it designed early so your barrier plan matches your approval.
  3. Excavation and crane, locked to your delivery date. The excavator digs and lays the base. The crane places the shell on delivery day.
  4. Plumber and electrician together. They connect the equipment while the shell is being backfilled and filled with water.
  5. Concreter for the bond beam. This locks the shell in place.
  6. Fence installed, final inspection booked. Your pool needs a compliant barrier and sign-off before it's used.
  7. Surrounds last. Paving, decking and landscaping finish the look.

A fibreglass pool can be installed in as little as 7 days once work starts. For a realistic week-by-week view, read how long it takes to install a fibreglass pool.

Pro tip: Start your fencing quote and your certifier enquiry the same week you order your pool. They are the two steps most likely to add weeks if you leave them until the shell arrives.

Cosmo 9m Bond Beam Install.jpgFibreglass Bond Beam Install

Which trades must be licensed?

Plumbing and electrical work must be done by licensed trades in every state. Beyond that, the rules depend on where you live and how much the work is worth.

  • NSW: Residential building work over $5,000 must generally be carried out by a properly licensed contractor. If you act as an owner-builder and manage residential building work valued at more than $10,000, you need an owner-builder permit.

  •  

    QLD: Pool builders and installers generally need the appropriate QBCC licence for swimming pool construction, installation or maintenance. An owner-builder permit is required for building work valued at more than $11,000 including GST.

  •  

    VIC: If domestic building work is valued at more than $16,000, you need a Certificate of Consent from the Building and Plumbing Commission Victoria before acting as an owner-builder.

  •  

    ACT: Check owner-builder and contractor licensing requirements with Access Canberra before starting pool work.



Thresholds and rules change, so always confirm with your certifier or the state authority before you book. If you're in NSW, our NSW pool registration guide walks through approval, fencing, certification and registration. Queensland buyers can read our QLD pool safety certificate guide.

What does the pool kit cover, and what do the trades cover?

Knowing where the kit ends and the trades begin stops surprises on your budget.

Included in your SPKD kit Booked by you (trades)
Fibreglass pool shell Approval and certification
Equipment package (Filtration, chlorination, pump etc) Excavation, spoil removal and base
Certified engineering drawings for your approval Crane hire
Delivery to your kerb Plumbing and electrical connection
Support from the SPKD team Bond beam, fencing, paving and landscaping

For the full breakdown, see what's in an inground pool package and compare equipment packages.

What questions should you ask each trade before booking?

  • Every trade: What's your licence number? Do you have public liability insurance? Have you worked on fibreglass pools before?
  • Excavator: What happens to the price if we hit rock? Is spoil removal included? Can your machine fit down the side of the house?
  • Crane: What's the reach to the hole? Are there power lines in the way? Is the operator and dogman included?
  • Plumber and electrician: Will you supply a compliance certificate when the job is done?
  • Fencer: Will the design meet my state's pool barrier standard and my certifier's requirements?

Get two to three quotes for each trade. Prices vary widely by region and site access.

Our 8m Cosmopolitan in QuartzFinished DIY fibreglass pool with compliant glass pool fence and decked surrounds in an Australian backyard

What if you don't want to manage the trades yourself?

That's fine too. You still get the same shell, the same equipment and the same price on the kit. The SPKD team can talk you through your options for your area and get you in contact with an installer. Most customers find that once the certifier and excavator are booked, the rest falls into place.

Frequently asked questions

Ready to plan your build?

Tell us which pool you're looking at and where you live. We'll send you a full kit price and help you map out your trades.

 

Get My Pool Kit Quote

Keep Reading

6m Oasis Install
What Trades Do You Need to Install a DIY Fibreglass Pool? (The Complete List)

To install a DIY fibreglass pool kit in Australia you typically need a certifier (or council), an excavator ...

Read
6m Oasis Install
Fibreglass Pool Shells vs Concrete for Fast Installs

The biggest fear most people have about building a pool is not the cost. It is how long their backyard will ...

Read
6m Oasis Install
Magnesium Pools: Benefits, Costs & Maintenance in Australia

A magnesium pool still uses chlorine. That is the first thing to understand before comparing systems, ...

Read
6m Oasis Install
What’s in an Inground Pool Package? The Full Checklist

Inground Pool Packages Explained: What’s Actually Included (and What Isn’t) Quick answer: A complete inground ...

Read
6m Oasis Install
Inground Spa vs Plunge Pool: Which Should You Choose?

Inground Spa vs Plunge Pool: Which One Suits Your Backyard? By Colm, Managing Director, Swimming Pool Kits ...

Read

Dive Into Our
Learning Centre

We've compiled the most commonly asked questions, from pool installation and maintenance to customisation options and council approval. Dive into our learning centre to find the answers you're looking for.

Visit Learning Centre